Home
About Us
Group Profile
Honors
Patents
Equipment
Innovations
Video
History
News
Announcement
Group News
Industry News
Service
Products
Sales Network
International Trade
Service Support
After-Sales Service
Feedback
FAQ
Service Objectives
Contact Us
Message
NEWS CENTER
The Development and Reform Commission approved 8 new infrastructure projects with a total investment of more than 90 billion.
On October 15, the national development and Reform Commission announced eight newly approved infrastructure projects, including five highway projects, two railway projects and one waterway improvement project, with a total investment of 95.316 billion billion yuan. Since October, the National Development and Reform Commission has approved a total investment of more than 365.3 billion yuan in infrastructure projects.
06
2015
/
10
Use and Maintenance of Crane Wire Rope
Must adhere to the inspection of wire rope in each operation shift and form a system. No dead corners shall be left in the inspection. Sufficient attention shall be paid to the parts that are not easy to see and are not close to, and flaw detection shall be carried out when necessary. In the inspection and use should be done
26
2014
General safety operation requirements for crane operators
First, the relevant personnel should carefully change shifts, carefully check the reliability of hooks, wire ropes, brakes, and safety protection devices, and report any abnormalities in time.
Knowledge of lifting equipment
The operation of the crane requires a wealth of experience in order to avoid unnecessary accidents. So some experience is very useful, the following is a summary of some experts crane common sense, I hope useful to everyone
Safety operation essentials of electric hoist
Improper lifting and operation of the electric hoist. The electric hoist will cause the hanging object to swing and cause an accident. Electric hoist lifting, when the wire rope or chain tension should stop, electric hoist according to the direction of the hook shaking again to find the hook, at the same time, lifting workers should check whether the lifting is firmly hung; Electric hoist lifting not too hard, when the lifting object out of the obstacle can speed up the lifting speed; Electric hoist lifting objects are not easy to be high, generally more than 0.5m of the highest safety passage is better. When the electric hoist is running. If conditions permit, it is best to lift about 0.5m from the ground, and the crane will lift the objects in the electric hoist.
20
05
2010
M4 grade FOH/FOHS type planetary series wire rope electric hoist
09
12