1,Jiangxia companyElectric hoist for hot dip galvanizing blow plating production lineProject overview:
According to the site situation of the company's pickling production line, due to the complex site conditions and harsh environment, acid mist is serious. Completely rely on manual operation of the crane has been unable to meet the production safety and production efficiency needs. Therefore, an automatic operation crane is needed to replace the crane that is completely operated by manual operation, so as to improve work efficiency, reduce manual participation and reduce labor costs.
Crane equipment provided by 2. Pegasus Lifting
- Overview of overall scheme
This program for the specific circumstances of the automatic crane and the site environment and other requirements to carry out the design of the program. In the design of the initial consideration of the new system in the field of installation, commissioning, maintenance and interface issues.
The new crane adopts the form of double electric hoist lifting mechanism, I .e. two I-steel structures are adopted, two electric hoists are installed respectively, and the two electric hoists lift the same spreader together. Since the lifting point of the crane is fixed, the hoisting mechanism is fixed and there is no cart running mechanism. In order to improve the positioning accuracy of the car, the car uses the scanning code positioning form. The electric control system adopts Siemens G120High performance variable frequency control scheme,S7-1500PLC G120In the form, the lifting mechanism is provided with a position encoder to ensure that the crane can be accurately positioned during operation and improve work efficiency.
Set up a set of remote console, configure the touch screen to display the working status, and set the control button on the console to give the crane position command and emergency stop. Remote console and on-board industrial wireless APfor wireless communication.The overall layout and model master drawings are shown in Figures 1 and 2.

Figure I

Figure II
2. Crane Equipment Details
| Electric hoist for hoisting mechanism |
A(1 1) B(1 1)= 4 sets |
| Operation power supply positioning distance |
Double track40X2=80M |
| Intelligent Control System (Figure 3) |
1 set |
| Manual control system (Fig. 4) |
1 set |

Figure III:Intelligent control: control screen operation, large screen display

Figure IV:Manual control: wireless handle remote control operation
3. pickling galvanizing equipment installation
General Manager Han Junqiang took the lead and led the engineer team to the crane equipment installation site in Jiangxi, and gave technical guidance to assist the engineer team in debugging the equipment.


After friendly communication and technical exchange with the person in charge of Jiangxi production line, our engineers also carried out automatic debugging on site to makeAutomatic pickling craneIt will play a greater role in the production line, enhance the willingness of both parties to cooperate, and lay a solid foundation for deeper cooperation in the future.


This time, our company producedAutomatic pickling cranewith itsSafe, accurate and effective pickling line workThe performance,It saves labor costs, effectively reduces the occurrence of production accidents, prevents acid mist from harming the human body, and saves energy and efficiency.The installation of this equipment makes Pegasus crane take a big step on the road of innovation, and strongly responds to the requirements of the state for the manufacturing industry in the new era-- Innovation-driven development!